
Tag Archives: BIM Level 2
Introduction Would the design and construction process benefit from generating the Building Owners manual / Operations and Maintenance Manuals using the building asset data? If this is possible then would it also work for the Building Log book, Health and Safety file? Please don’t think this is a magic bullet the axiom “rubbish in rubbish…
Inspired by Issac Azimovs 3 laws of robotics I have engineered my own 3 guiding laws to ensure Asset Information Models (AIM) are assembled coherently for this age “the internet of BIM” where data is at the centre. AIM is orientated around the built environment and an AIM may contain all the data for physical…
In the Asset Information Model we can import COBie data. This does not have to be a single dataset of the whole building because the COBie work flow was designed so that different parties could contribute data to the AIM without having to go through a modeling application. In a design model the product suppliers and…
We have for years been faced with building Asset Information Models with very rough data. From scanned handover drawings, PDF scan, PDF vector ,Plot Files, 2D Cad. Even today with the wider use of 3D Building Modeling we are having to use our tools built developed over years the years. Our journey with BIM is probably…